Pennsylvania Avenue
Washington, DC
The committee had characterized the Avenue as “the grand axis of the city as also of the Nation, leading from the Capitol to the White House,” and also called it the symbolic passage between two lofty centers of government – illustrating the separation of powers but also their linkage in a deeper unity. — Report of the President’s Council on Pennsylvania Avenue, 1964
History
Pennsylvania Avenue from the Willard Hotel, photo © Allen Russ.
, created in 1792 as Washington’s central thoroughfare, was a significant element of ’s for the Federal City. The most noteworthy section of its 20-mile length is the 1.2-mile long stretch that runs diagonally between and the , providing both a physical and symbolic reminder of the association between the legislative, judicial and executive branches of government. This section became the in 1966, later part of the Pennsylvania Avenue National Historical Park (part of the U.S. National Park System); the National Park Service is responsible for overseeing and maintaining the parks, plazas, and sidewalks.
In 1803, the avenue was designated an official parade route by President , who, envisioning it as a grand boulevard, had Lombardy Poplars planted along its length. It was the first street in Washington to be lit by streetlights and a major focus of the McMillan Commission’s 1901-1902 plan for the City.
During the 1961 inaugural parade for John F. Kennedy, the new President noticed that the Avenue had fallen into disrepair and in that year created the President’s Council on Pennsylvania Avenue to address its lackluster state. The council proposed simplifying intersections, building new public spaces, and opening up vistas between the National Archives and National Portrait Gallery. After Kennedy’s assassination in 1963 Lyndon B. Johnson advanced the work by establishing the President’s Temporary Commission on Pennsylvania Avenue. Members of the commission included Nathaniel Owings, , Daniel Patrick Moynihan, and Chloethiel Woodard Smith.
In October of 1972, an act of Congress created the Pennsylvania Avenue Development Corporation (PADC) to prepare a plan for the Avenue and some 16 blocks north of it and manage the design and implementation of that plan, including improvements to the Avenue. The innovative partnership, a federally-owned corporation, administered by a fifteen-member Board of Director’s, led by Executive Director John Woodbridge, sought to engage the public in the redesign of the significant thoroughfare. Initial funding for the project came through in 1973, and in 1974, the PADC published The Pennsylvania Avenue Plan: 1974, based in part on recommendations put forth in the 1964 Report of the President’s Council on Pennsylvania Avenue. In its Plan PADC attempted to establish visual and physical continuity within the Avenue’s core, provide refurbishments, and remedy problems with traffic and pedestrian circulation. PADC anticipated that its work would become an economic catalyst for the adjoining downtown area.
Photos courtesy the Cultural Landscape Foundation.
The work of PADC addressed both the buildings and the landscape along the Avenue. Major initiatives included establishing a consistent building height requirement of 135 feet to frame the Avenue by matching the building height of the 1930s style Federal Triangle Complex that anchored almost the entire southern side of the Avenue, and creating a consistent 50-foot setback on the north side of the Avenue, which allowed PADC to widen the northern sidewalks to accommodate a third row of newly planted Willow Oak trees. PADC oversaw all public improvements along the Avenue, which included repaving the street, and the installation of a unified streetscape of square brown brick pavers, granite curbing and trees (conceptual design by ), tree grates and wood and cast-iron benches (designed by Albert Paley) and trash cans, fountains and lighting. Beginning in the late 1970s, prominent architects and landscape architects were hired to contribute to the design and redesign of eight public spaces, which included (, , ) Market Square Park (Conklin Rossant, Eric Gugler), Indiana Plaza (Tippets-Abbett-McCarthy-Stratton), ( and Associates), Sherman Park, Mellon Park, ( + Partners, Oehme van Sweden & Associates) and Meade Plaza (Bernard Johnson, Inc., Gruen Associates, Oehme van Sweden & Associates), the last of which was completed in 1993.
Congress dissolved PADC as of April 1, 1996, with only a few sites remaining to be redeveloped or renovated. When completed, development that took place within the Plan’s boundaries generated millions in private investment; over the years the cumulative return in tax revenues from this private development more than exceeded the government’s investment in public improvements along the Avenue.
Since the completion of PADC’s work, changes to the Avenue have been minimal. A notable exception was the closure of the portion of the Avenue in front of the White House grounds and Department of Treasury building after the 1995 Oklahoma City bombing. and Associates redesigned the three-block section under the National Capital Planning Commission’s guidance as a pedestrian thoroughfare in 2004.